| Project Name | Construction of 6-lane Greenfield Karnal Ring Road starting from NH-44 near Village Shamgarh (Design km 0+000 ) and terminating at Karnal – Munak Road (MDR -115) near Village Samalakha (Design km 34+500) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode. |
| Client Name | National Highways Authority of India |
| NH No. (New/ Old) | Karnal Ring Road |
| Mode of the Execution (BOT Toll/ BOT Annuity/ EPC/ HAM/ Item Rate/ Others) | Hybrid Annuity Mode |
| No. of Lanes/ Configuration | Six Lane |
| Length of the Project (in Km) | 34.50 Km |
| Bid Project Cost (in Cr) | INR 997.11 Cr. |
| Concessionaire Name | H.G. Karnal-Ringroad Pvt. Ltd. |
| Date of Award (LOA Date) | 29/12/2022 |
| Appointed Date | 31-Aug-23 |
| Concession Period | 17 Years |
| Construction Period (in Days) | 730 Days/2 Years |
| O&M Period (in Years) | 15 Years |
| Scheduled Date of Completion | 30-Aug-25 |
| EPC Contractor | H.G. Infra Engineering Limited |
| Independent Engineer | LEA Associates South Asia Pvt. Ltd. |
| No. of Bridges | Major Bridges – 3 Nos Minor Bridges – 9 Nos |
| No. of Toll Plazas | NIL |
| No. Of Culverts | Pipe Culverts – 6 Nos. Box Culvert – 66 Nos. |
| No. of Fly Overs/Under Passes | Flyover – 6/Under Passes (VUP+LVUP) – 1+14 Nos |
| No. of Elevated Structure / ROB | ROB – 1 Nos |
| DISTRICT_NAME_ENG | Total_Visitors | Total_Amount |
| Ajmer | 103 | 4130 |
| Alwar | 39 | 420 |
| Barmer | 2 | 40 |
| Bharatpur | 16 | 230 |
| Bhilwara | 1 | 10 |
| Bikaner | 18 | 310 |
| Chittorgarh | 50 | 910 |
| Dungarpur | 2 | 40 |
| Jaipur | 147550 | 9340884.52 |
| Jaisalmer | 99 | 4870 |
| Jhalawar | 1 | 20 |
| Jodhpur | 16 | 260 |
| Sikar | 2 | 20 |
| Sirohi | 4 | 70 |
| Udaipur | 261 | 4670 |